Paver Base Calculator

Enter the size of the patio and the depth of the sub-base and the bedding sand and get the sub-base in tonnes and the sand in bags or tonnes, each rounded up once on its own.

A ready-made setup of the Paver Calculator.

Estimates for planning, not professional advice. Read the full notice.

Patio size

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 4 metres, 13 feet 1 and 1 half inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 3 metres, 9 feet 10 and 1 eighth inches

Enter the depth in millimetres, or type a unit.

reads as 150 millimetres, 5 and 7 eighths inches

Enter the depth in millimetres, or type a unit.

reads as 40 millimetres, 1 and 9 sixteenths inches

Example: a paved patio

3 t to order (2.9 t exact)

  • Sub-base: loose volume, with its allowance 1.8 m³ (63.57 ft³)
  • Sub-base, tonnes at the supplier's smallest order 3 t
  • Bedding sand: loose volume, with its allowance 0.48 m³ (16.95 ft³)
  • Bags of the size above 9 × 56 L (1.98 ft³) bags
  • Sub-base by the tonne, 1 t 3 t
  • Bedding sand by the bag, 56 L (1.98 ft³) bag 9

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How much sub-base do I need under paving?

    Enter the patio size and the sub-base depth. The calculator gives the compacted volume, the loose volume with your bulking allowance and the tonnes at the weight you enter.

    How much bedding sand goes under paving?

    Enter the bedding depth. The sand is a loose layer with no expansion, counted in whole bags of the size you choose or in tonnes at your weight.

    Where do the depths and weights come from?

    They are examples to replace. No depth, weight or bulking allowance is taken from a source, and the calculator does not judge the depth you type.

    Worked example: a paved patio

    Show the steps
    1. Sub-base: volume in place 12 m² (129.17 ft²) × 150 mm (5 7/8 in) (0.15 m) = 1.8 m³ (63.57 ft³)
    2. Sub-base: loose volume, with its allowance 1.8 m³ (63.57 ft³) + 0 per cent allowance = 1.8 m³ (63.57 ft³)
    3. Sub-base: tonnes at the weight 1.8 m³ (63.57 ft³) × 1,600 kg/m³ (1.6 t/m³) = 2.9 t
    4. Sub-base: round up once, to the smallest tonnage 2.9 t = 3 t
    5. Bedding sand: loose volume, with its allowance 12 m² (129.17 ft²) × 40 mm (1 9/16 in) (0.04 m) = 0.48 m³ (16.951 ft³)
    6. Bags: divide by the bag size, round up once 0.48 m³ (16.951 ft³) ÷ 56 L = 9 × 56 L (1.98 ft³) bags

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Weight of the sub-base, example 1,600 kg/m³ (1.6 t/m³, as published)
    Default An example to replace, not a figure from a source. Ask your supplier.
    Weight of the bedding sand, example 1,600 kg/m³ (1.6 t/m³, as published)
    Default An example to replace, not a figure from a source. Ask your supplier.
    Waste allowance 0%
    Default No hidden allowance. Check your label or supplier.
    Sub-base bulking allowance, example 0%
    Default The share added to the compacted depth to get the loose amount. It starts at nothing: enter your supplier's figure.
    Supplier's smallest order in tonnes 0.5 t
    Default Suppliers set a smallest order by weight. This figure is an example to replace. Ask your supplier.
    Bag size in litres (examples; use your own) 56 L
    Default The bag size is printed on the label. The sizes shown are examples, not figures from a source. Check your label.

    Sub-base and sand by patio size

    Tonnes of sub-base and bags of bedding sand for five patio sizes at the starting depths

    Tonnes of sub-base and bags of bedding sand for five patio sizes at the starting depths
    Patio areaSub-base, tonnesSand, bags
    9 m² (96.88 ft²) 2.5 t7 bags
    12 m² (129.17 ft²) 3 t9 bags
    16 m² (172.22 ft²) 4 t12 bags
    20 m² (215.28 ft²) 5 t15 bags
    30 m² (322.92 ft²) 7.5 t22 bags

    Each row is worked out on its own. The sub-base is bulked up to loose material and the bedding sand is loose already.