Example: a house in fibre cement boards
189 fibre cement boards
- Net wall area 92.35 m² (994.05 ft²)
- Opening trim pieces 9 opening trim pieces
- Corner posts 4 corner posts
- Starter strip pieces 14 starter strips
Estimate for planning, from what you entered and the product data shown. Check product labels and your supplier before you buy.
Result
Enter a size to see your total.
Each product is rounded up once for the whole project, so the total can be less than the items bought alone added together. A line counted from a cut layout (sheets, boards or tiles laid out piece by piece) is counted for each item and added.
- Fibre cement boards 189
- Opening trim, Opening trim pieces 9
- Corner posts 4
- Starter strip, Starter strip pieces 14
Questions
How many fibre cement boards cover a wall?
The net wall area with waste added once, divided by the area one board covers: its length times its exposure. Change the exposure and the count changes; use the figure from your own boards.
Why is the exposure a number I enter?
Boards of different makers and ranges show different amounts. The calculator counts what you give it and does not assume a maker's figure.
Worked example: a house in fibre cement boards
Show the steps
- Gross wall: the distance around the house times the wall height 40 m (131 ft 2 13/16 in) × 2.5 m (8 ft 2 7/16 in) = 100 m² (1,076.39 ft²)
- Openings: every door and window at its own size 7.65 m² (82.34 ft²) = 7.65 m² (82.34 ft²)
- Net wall: gross wall less the openings 100 m² (1,076.39 ft²) − 7.65 m² (82.34 ft²) = 92.35 m² (994.05 ft²)
- Add the waste allowance, once, to the net wall 92.35 m² (994.05 ft²) + 10% waste = 101.59 m² (1,093.45 ft²)
- Divide by the area one piece covers: its length times the exposure 101.59 m² (1,093.45 ft²) ÷ 0.54 m² (5.81 ft²) = 188.12 pieces
- Round up once, to whole pieces 188.12 pieces = 189 fibre cement boards
Assumptions
The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.
| Assumption | Value | Details and changes |
|---|---|---|
| Waste allowance | 10% | |
| Default Your own allowance, added once to the total. Check your label or supplier. | ||
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm