Concrete Steps Calculator

Enter the riser height, tread depth and width of concrete steps, with a platform if there is one, and get the volume and the bags to buy, with each step's block worked out.

A ready-made setup of the Stair Calculator.

Estimates for planning, not professional advice. Read the full notice.

Steps

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 170 millimetres, 6 and 11 sixteenths inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 280 millimetres, 11 inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 1.2 metres, 3 feet 11 and 1 quarter inches

The flat landing at the top. Leave blank to use the tread.

reads as 900 millimetres, 2 feet 11 and 7 sixteenths inches

Fill in with the largest riser to take the riser count and height from the total rise.

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

Example: three concrete steps

57 30 kg (66.1 lb) bags

  • Concrete in the steps 0.72 m³ (25.5 ft³)
  • To mix, with the allowance for waste 0.79 m³ (28.05 ft³)

Estimate for planning, from what you entered and the product data shown. Check product labels and your supplier before you buy.

  • Concrete mix, 30 kg (66.1 lb) bag 57

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How much concrete for three steps?

    The example above works out three steps with a platform, step by step. Enter your own riser, tread, width and platform for your own volume and bags.

    How do I add a landing?

    Add it as a second item on the shopping list: a landing is a flat box of concrete, so enter its length, width and thickness. The two items share one bag count.

    Can it work out the number of steps from the total rise?

    Yes. Fill in the total rise and the largest riser and the calculator divides the rise into whole risers, then uses each riser's equal height. It sets no riser or run limit.

    Worked example: three concrete steps

    Show the steps
    1. Concrete in the first step 1.2 m (3 ft 11 1/4 in) × 170 mm (6 11/16 in) × 900 mm (2 ft 11 7/16 in) = 0.184 m³ (6.484 ft³)
    2. Concrete in the second step 1.2 m (3 ft 11 1/4 in) × 170 mm (6 11/16 in) × 1.18 m (3 ft 10 7/16 in) = 0.241 m³ (8.501 ft³)
    3. Concrete in the third step 1.2 m (3 ft 11 1/4 in) × 170 mm (6 11/16 in) × 1.46 m (4 ft 9 1/2 in) = 0.298 m³ (10.518 ft³)
    4. All the steps 0.184 m³ (6.484 ft³) + 0.241 m³ (8.501 ft³) + 0.298 m³ (10.518 ft³) = 0.722 m³ (25.503 ft³)
    5. Add the allowance for waste once 0.722 m³ (25.503 ft³) + 10% = 0.794 m³ (28.053 ft³)
    6. Divide by the volume of one bag 0.794 m³ (28.053 ft³) ÷ approx. 0.014 m³ (0.49 ft³, converted)[1] = 56.74 bags
    7. Round up once, to whole bags 56.74 bags = 57 × 30 kg (66.1 lb) bags

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Concrete allowance for waste 10%
    Default A typed allowance, not a source's figure: no hidden extra. Ten per cent is the starting example; ask your supplier.
    Volume of one bag of QUIKRETE Concrete Mix 25 kg 12.18 L (0.43 ft³, as published)[2]
    Target Products prints one 25 kg bag of QUIKRETE Concrete Mix as 0.43 ft³.
    Volume of one bag of QUIKRETE Concrete Mix 30 kg 14.72 L (0.52 ft³, as published)[2]
    Target Products prints one 30 kg bag of QUIKRETE Concrete Mix as 0.52 ft³.
    Volume of one bag of SAKRETE Concrete Mix 30 kg approx. 0.014 m³ (0.49 ft³, converted)[1]
    One 30 kg bag of SAKRETE Concrete Mix (Sika Canada) yields approximately 0.014 m³.
    Volume of one bag of SAKRETE Fast Set 30 kg approx. 0.014 m³ (0.49 ft³, converted)[3]
    One 30 kg bag of SAKRETE Fast Set (Sika Canada) yields approximately 0.014 m³; the sheet adds about 2.3 L of water per bag.

    Each step's block of concrete

    The depth of each step's block and its concrete, for the example steps, counted from the top step

    The depth of each step's block and its concrete, for the example steps, counted from the top step
    StepDepth of the blockConcrete
    Step 1 900 mm (2 ft 11 7/16 in)0.18 m³ (6.48 ft³)
    Step 2 1.18 m (3 ft 10 7/16 in)0.24 m³ (8.5 ft³)
    Step 3 1.46 m (4 ft 9 1/2 in)0.3 m³ (10.52 ft³)

    A step's block runs from the front of its tread back to the wall or the platform, so lower steps hold more concrete. Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers.

    Sources (3)

    1. SAKRETE Concrete Mix, product data sheet (Canada) (opens in new tab), Sika Canada Inc. (SAKRETE), Product data sheet, edition not printed in the text read. Manufacturer data.
      “30 KG (66 lb) yields approximately 0.014 m3 (1/2 ft3).”
      Per SAKRETE's data sheet, checked 13 Nov 2026. Figures and codes change; verify with the source. Back to where this is used (Source 1)
    2. QUIKRETE Concrete Mix (Target Products product page) (opens in new tab), Target Products Ltd. (QUIKRETE Canada), Product page, undated. Manufacturer data.
      “25 kg (55 lb) bag = 0.43 ft3.”
      “30 kg (66 lb) bag = 0.52 ft3.”
      Per QUIKRETE's product page, checked 14 Nov 2026. Figures and codes change; verify with the source. Back to where this is used (Source 2)
    3. SAKRETE Fast Set, product data sheet (Canada) (opens in new tab), Sika Canada Inc. (SAKRETE), Product data sheet, edition not printed in the text read. Manufacturer data.
      “30 KG (66 lb) yields approximately 0.014 m3 (1/2 ft3).”
      “Add approximately 2.3 L (2.4 qts) of clean water per 30 KG (66 lb) bag, or enough to achieve a workable mix.”
      Per SAKRETE's data sheet, checked 14 Nov 2026. Figures and codes change; verify with the source. Back to where this is used (Source 3)

    These are summaries of what the sources say, not professional advice. Building codes and product data change. Check with your local building department and the product label about your own project.