Concrete Slab Calculator
HoneyDoMath.com
Enter the size of your shed slab, walkway or patio and get the concrete to buy, plus the volume of the sub-base under it, with every step shown.
A ready-made setup of the Concrete Calculator.
Estimates for planning, not professional advice. Read the full notice.
The drawing did not open. Length and width are still here.
Slab: shape and size
Skip the drawingDrag a round corner to move it. The small hollow diamond on a side is its curve handle: drag it across the side to curve the side (it is not a corner). To add a corner (a new point), tap the side itself, then choose Add a point here. Tapping a corner or a side opens its actions. Drag empty space to move the view; pinch, or Ctrl and the mouse wheel, to zoom. The keys are listed under Keys.
Keys
- Tab
- next corner; each says how far it is from corner 1
- Arrow keys on a corner
- move it one square; ten with Shift; 1 mm with Alt
- Delete or Backspace
- remove the corner; its two sides join in one straight side
- + on a corner
- add a corner halfway along the next side
- Arrow keys on the drawing
- move the view; farther with Shift
- + and - on the drawing
- zoom in and out
- 0 on the drawing
- show the whole shape
- Ctrl+Z (Cmd+Z on a Mac)
- undo, except inside a typed field (it keeps its own)
- Ctrl+Shift+Z or Ctrl+Y
- redo
- Escape while dragging
- put it back where it was
- Enter on a corner or side
- go to its actions
- Escape in the actions
- close them and go back to the drawing
The drawing did not load. Check your connection and try again.
- Area
- 4.32 m² (46.5 ft²)
- Perimeter
- 8.4 m (27 ft 6 11/16 in)
- Cut-out edges
No area until the shape is fixed.
Estimate for planning, from what you entered and the product data shown. Check product labels and your supplier before you buy.
Shape: Rectangle Change
Sides
Corners
Cut-outs
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm
Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers. Figures come from each maker's published sheets and are shown for information only.
Example: a shed slab
34 30 kg (66.1 lb) bags
- Concrete in the slab 0.43 m³ (15.26 ft³)
- Sub-base, in place 0.43 m³ (15.26 ft³)
Result
Enter a size to see your total.
Each product is rounded up once for the whole project, so the total can be less than the items bought alone added together. A line counted from a cut layout (sheets, boards or tiles laid out piece by piece) is counted for each item and added.
- Concrete mix, 30 kg (66.1 lb) bag 34
Questions
How much concrete do I need for a slab?
Multiply the length, width and depth to get the volume, add a waste allowance, and read the result in cubic metres or bags. The calculator shows every step for a slab of your size.
How much concrete do I need for a shed slab?
The example on this page is a shed slab. Enter your own length, width and depth to see the volume and the bags for your size.
What is the sub-base under a concrete slab?
It is a layer of compacted gravel or crushed stone that the concrete sits on. This page shows its volume in place, from the slab's own footprint and the depth you enter, so you can carry it to the material you order it in.
Is the sub-base part of the concrete count?
The sub-base is stone, not concrete, so the concrete count here covers only the slab. The sub-base volume is shown on its own line.
Where do the bag yields come from?
From the bag maker's own data sheet, listed under Sources with the date it was checked. Other mixes and other makers can yield differently, so read your own bag's label.
Worked example: a shed slab
Show the steps
- Slab area 2.4 m (7 ft 10 1/2 in) × 1.8 m (5 ft 10 7/8 in) = 4.32 m² (46.5 ft²)
- Slab volume 4.32 m² (46.5 ft²) × 100 mm (3 15/16 in) (0.1 m) = 0.432 m³ (15.256 ft³)
- Add the waste allowance 0.432 m³ (15.256 ft³) + 10% = 0.475 m³ (16.782 ft³)
- Divide by the bag's yield 0.475 m³ (16.782 ft³) ÷ approx. 0.014 m³ (0.49 ft³, converted)[1] = 33.94 bags
- Round up once, to whole bags 33.94 bags = 34 × 30 kg (66.1 lb) bags
- Sub-base volume, in place 4.32 m² (46.5 ft²) × 100 mm (3 15/16 in) (0.1 m) = 0.43 m³ (15.26 ft³)
Assumptions
The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.
| Assumption | Value | Details and changes |
|---|---|---|
| Waste allowance (your own figure) | 10% | |
| Default Your own figure, not a sourced one. 10% is only the starting value; set the allowance you want. | ||
| Yield of the 30 kg bag | approx. 0.014 m³ (0.49 ft³, converted)[1] | |
| One 30 kg bag of SAKRETE Concrete Mix (Sika Canada) yields approximately 0.014 m³. | ||
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm
Slab jobs
Concrete volume, bags and sub-base volume for common slab jobs
| Job (sizes) | Slab volume, without waste | To order, with waste | In 30 kg bags | Sub-base, in place |
|---|---|---|---|---|
| Round slab, 3 m across × 100 mm | 0.71 m³ (24.96 ft³) | 0.78 m³ (27.46 ft³) | 56 × 30 kg (66.1 lb) bags | 0.71 m³ (24.96 ft³) |
| Walkway, 5 m × 1 m × 75 mm | 0.38 m³ (13.24 ft³) | 0.41 m³ (14.57 ft³) | 30 × 30 kg (66.1 lb) bags | 0.5 m³ (17.66 ft³) |
| Driveway, 6 m × 3 m × 150 mm | 2.7 m³ (95.35 ft³) | 2.97 m³ (104.88 ft³) | 213 × 30 kg (66.1 lb) bags | 1.8 m³ (63.57 ft³) |
The waste allowance in the assumptions above is added once and the bags are rounded up once. The sub-base column uses the sub-base depth from the example and is a volume in place, with no waste allowance.
What NBC 2020 prints for slab thickness
Thickness of concrete slabs, Sentence 9.16.4.3.(1) of the National Building Code of Canada 2020, Part 9
| Figure | Value in the code |
|---|---|
| Concrete slab, not counting a topping, at least | 75 mm (2 15/16 in, converted) |
Source: [2]
A model-code figure for floors on ground. Provinces and territories adopt the code with changes, and the calculator uses only the thickness you enter: your local building department decides what applies to your slab.
Bagged concrete by maker
Rows: 4
What one bag yields and the bags for one cubic metre, for each maker's bagged concrete
| Product and bag size | Yield per bag | Bags for 1 m³ |
|---|---|---|
| QUIKRETE Concrete Mix 25 kg | 12.18 L (0.43 ft³, as published) (per QUIKRETE's product page, checked 14 Nov 2026) | 83 × 25 kg (55.1 lb) bags |
| QUIKRETE Concrete Mix 30 kg | 14.72 L (0.52 ft³, as published) (per QUIKRETE's product page, checked 14 Nov 2026) | 68 × 30 kg (66.1 lb) bags |
| SAKRETE Concrete Mix 30 kg | approx. 0.014 m³ (0.49 ft³, converted) (per SAKRETE's data sheet, checked 13 Nov 2026) | 72 × 30 kg (66.1 lb) bags |
| SAKRETE Fast Set 30 kg | approx. 0.014 m³ (0.49 ft³, converted) (per SAKRETE's data sheet, checked 14 Nov 2026) | 72 × 30 kg (66.1 lb) bags |
Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers. Figures come from each maker's published sheets and are shown for information only.
The list is in alphabetical order by maker. The yield is the maker's own figure and the bags for one cubic metre are rounded up once, with no waste allowance. Your bag's label comes first.
Sources (4)
-
SAKRETE Concrete Mix, product data sheet (Canada) (opens in new tab), Sika Canada Inc. (SAKRETE), Product data sheet, edition not printed in the text read.
Manufacturer data.
“30 KG (66 lb) yields approximately 0.014 m3 (1/2 ft3).”
Per SAKRETE's data sheet, checked 13 Nov 2026. Figures and codes change; verify with the source. Back to where this is used (Source 1) -
National Building Code of Canada 2020, Sentence 9.16.4.3.(1), page 9-104 (opens in new tab), National Research Council of Canada, NBC 2020, Division B (Volume 2), NRC printing with revisions and errata of 31 March 2025.
Code or government.
“Concrete slabs shall not be less than 75 mm thick exclusive of concrete topping.”
Checked 13 November 2026. Figures and codes change; verify with the source. Back to where this is used (Source 2) -
QUIKRETE Concrete Mix (Target Products product page) (opens in new tab), Target Products Ltd. (QUIKRETE Canada), Product page, undated.
Manufacturer data.
“25 kg (55 lb) bag = 0.43 ft3.”
“30 kg (66 lb) bag = 0.52 ft3.”
Per QUIKRETE's product page, checked 14 Nov 2026. Figures and codes change; verify with the source. Back to where this is used (Source 3) -
SAKRETE Fast Set, product data sheet (Canada) (opens in new tab), Sika Canada Inc. (SAKRETE), Product data sheet, edition not printed in the text read.
Manufacturer data.
“30 KG (66 lb) yields approximately 0.014 m3 (1/2 ft3).”
“Add approximately 2.3 L (2.4 qts) of clean water per 30 KG (66 lb) bag, or enough to achieve a workable mix.”
Per SAKRETE's data sheet, checked 14 Nov 2026. Figures and codes change; verify with the source. Back to where this is used (Source 4)
These are summaries of what the sources say, not professional advice. Building codes and product data change. Check with your local building department and the product label about your own project.
Sources
- [1] SAKRETE, SAKRETE Concrete Mix, product data sheet (Canada). Checked 13 November 2026. https://can.sika.com/dam/dms/ca01/i/Sakrete%20Concrete%20Mix_pds-en.pdf
- [2] National Research Council of Canada, National Building Code of Canada 2020, Sentence 9.16.4.3.(1), page 9-104. Checked 13 November 2026. https://nrc-publications.canada.ca/eng/view/ft/?id=515340b5-f4e0-4798-be69-692e4ec423e8&dp=2&dsl=en
- [3] QUIKRETE, QUIKRETE Concrete Mix (Target Products product page). Checked 14 November 2026. https://www.targetproducts.com/portfolio-item/concrete-mix/
- [4] SAKRETE, SAKRETE Fast Set, product data sheet (Canada). Checked 14 November 2026. https://can.sika.com/dam/dms/ca01/2/Sakrete%20Fast%20Set_pds-en.pdf