Topsoil Calculator

Enter the size of a lawn or a bed and a depth and get topsoil in cubic yards, rounded up once to the supplier's step, with the working shown for an example. A lawn or a bed that is not a rectangle can be drawn with Draw a shape.

A ready-made setup of the Dirt and Fill Dirt Calculator.

Estimates for planning, not professional advice. Read the full notice.

Bed size

Feet and inches, like 12' 6"

reads as 20 feet

Feet and inches, like 12' 6"

reads as 15 feet

Inches, like 4 in

reads as 4 inches

Example: a lawn patch

4 yd³ to order (3.7 yd³ exact)

  • Topsoil in the patch 100 ft³
  • Cubic yards at the supplier's step 4 yd³

Shopping list

Example: a lawn patch
ItemSizeBuy
Topsoil by the cubic yard1 yd³4 yd³

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Worked example: a lawn patch

    Show the working
    1. Area 20 ft × 15 ft = 300 ft²
    2. Volume at the depth 300 ft² × 4 in = 100 ft³
    3. Add the waste allowance, once 100 ft³ + 0 % waste = 100 ft³
    4. Cubic yards: divide by the cubic feet in a yard 100 ft³ ÷ 27 ft³ in a yd³ = 3.7 yd³
    5. Round up once, to the supplier's step 3.7 yd³ = 4 yd³

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Topsoil depth (settled) 4 in[1]
    Default Penn State Extension: a minimum of 4 to 6 in of topsoil, firmed or settled, for a lawn.
    Topsoil weight (the source does not say loose or compacted) 0.8 ton/yd³[2]
    Default New Mexico EMNRD's factor for top soil.
    Landscape waste or overage 0%
    Default No silent overage. Check your label or supplier.
    Supplier's smallest ton step 1 ton
    Default Suppliers sell by the ton in steps. Check your label or supplier.
    Supplier's smallest yard step 0.5 yd³
    Default Suppliers sell bulk in steps. Check your label or supplier.
    Dump truck load 12 yd³[3]
    Default TxDOT: single-axle trucks normally carry 6 yd3, tandem-axle trucks usually 12 or 14.

    Lawn and bed jobs

    Topsoil for lawn and bed jobs in yards, tons and dump truck loads at two truck sizes

    Topsoil for lawn and bed jobs in yards, tons and dump truck loads at two truck sizes
    Job (size × depth)Cubic yardsCubic yards at the supplier's stepTons at the weight aboveTons at the supplier's stepDump truck loads at 12 yd³Dump truck loads at 14 yd³
    Patch 10 ft × 10 ft × 4 in 1.23 yd³1.5 yd³0.99 tons1 ton11
    Bed 12 ft × 4 ft × 4 in 0.59 yd³1 yd³0.47 tons1 ton11
    One acre × 4 in 537.78 yd³538 yd³430.22 tons431 tons4539

    Each row is worked out on its own at the default depth and the weight in the assumptions (the source does not say loose or compacted). The two truck sizes are the default load and the larger TxDOT tandem-axle figure; ask your hauler for theirs.

    Questions

    How deep does topsoil go under a lawn?

    Penn State Extension gives a range for a good-quality topsoil, measured firmed or settled, and the calculator starts from the low end of it. Enter your own depth in the depth field to see the amount change.

    How many bags of topsoil do I need?

    The bag count follows the volume: divide the cubic feet by the size printed on your bag and round up once, at the whole bag. The calculator gives cubic yards, so convert them to cubic feet before you divide by your bag label.

    Should I order topsoil by the ton or by the yard?

    Suppliers sell it either way. The calculator gives cubic yards; the jobs table shows tons at the New Mexico figure, which does not say whether it is loose or compacted. Ask your supplier which unit they sell and what their topsoil weighs.

    How many truck loads of topsoil is that?

    The jobs table divides the cubic yards by a dump truck load and rounds up once, at a default load and at a larger one from TxDOT. Enter the load your hauler gives you.

    Sources (3)

    1. Lawn Establishment (opens in new tab), Penn State Extension, web article, updated September 19, 2025. Code or government.
      “Typically, a minimum of 4 to 6 inches (firmed or settled depth) of a good-quality topsoil is needed to establish good-quality turf.”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 1)
    2. Conversion Factors for Construction Materials and Common Minerals (opens in new tab), New Mexico Energy, Minerals and Natural Resources Department, Mining and Minerals Division, undated one-page table, adapted from BLM H-3890-1 Handbook for Mineral Examiners. Code or government.
      “To convert cubic yards to short tons, multiply the commodity production cubic yardage by the conversion factors listed below. ... Base course 1.25 ... Fill Dirt 0.8 ... Gravel ¼" – 2" 1.42 ... Sand 1.45 ... Top Soil 0.8”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 2)
    3. Seal Coat and Surface Treatment Manual, Section 5: Haul Trucks, Size (opens in new tab), Texas Department of Transportation, web manual page, undated. Code or government.
      “The single-axle trucks normally carry 6 cubic yards of aggregate. The bed capacity for tandem-axle trucks is usually 12 or 14 cubic yards.”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 3)

    These are summaries of what the sources say, not professional advice. Codes and product data change. Check with your building department and the product label about your own project.